15.) Roger can do the project in x number hours. Conception can do the same job in 2 hours less than Roger does. Which of the choices below is the difference of their rate?

Answer:
A. 2x-2/x²-2x
Step-by-step explanation:
Let roger be 1/x and conception 1/(x-2)
> 1/x/1/x-2
> 1(x-2)/x(x-2)/1(x)/(x-2)x
> x-2/x²-2x/x/x²-2x
> 2x-2/x²-2x